Pump turned on at former New Energy ethanol plant

A single pump's been turned back on at the former New Energy ethanol plant.

According to Mayor Pete Buttigieg's office, the city reached an agreement with the outgoing owners of the facility Friday afternoon.

The pump will push about 4 million gallons of water out of the ground each day.

Since New Energy closed in November, about two dozen residents have reported problems with flooding and mold in their homes.

When it was operational, New Energy's pumps pushed about 6.2 million gallons out of the water everyday.

The Department of Public Works will continue to monitor the groundwater table.

It could take several days before residents will notice a difference in their homes.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WNDU - Channel 16 54516 State Road 933 South Bend, IN 46637 Front Desk: 574-284-3000 Newsroom: 574-284-3016 Email: newscenter16@wndu.com
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 191467981 - wndu.com/a?a=191467981
Gray Television, Inc.